Spools of fresh, raw Mogami cable ready for builds Bulk plugs selected Components for the cable build Pre-tin the plug with solder Check to make sure flow is even Insert Techflex polymer sleeving expose precise amount of shielding for hand twisting Pre-tin hand twisted wires (note separation of anti static shield on the right) Solder in place Visual Inspection Clamp, hot glue and adhesive-lined thick wall heat-shrink tubing added While hot glue is still setting, use clamp to tighten the barrel over insulating tab The other side’s wires are pre tinned as are the terminals of the plug After soldering the cable to the terminals a visual inspection is made Testing is done to make sure everything is fine before plug is secured Clamp, hot glue and adhesive-lined thick wall heat-shrink tubing added for stability Insulating tube covers assembly before barrel installed While hot glue is still setting, use clamp to tighten the barrel Final electrical test Custom rugged Riptie brand cable fastener installed Cable coiled in “figure 8” fashion Cable ready for shipment